References

Engineering

  • Rolling load out of a container bridge, approx. 750 t, onto a heavy load barge, Oslo, 02/2016
    Calculation of ballast operations, hydrostatics, instruction of ballast operation on barge Towage approval of the sea voyage
  • Rolling load out of “Jacket West” for an offshore converter station, approx. 5100 t, onto a heavy load barge, Stralsund, 05/2016
    Calculation of ballast operations, hydrostatics and stress
    Instruction of ballast operations on barge
  • Rolling load out of 2 container bridges, á approx. 1000 t, onto a self-propelled barge, Hong Kong, 01/2009
    Calculation of ballast operation, co-instruction of ballast operations and approval of the entire load out procedure
  • Rolling load out of 2 container bridges, á approx. 950 t, onto a barge at Hamburg and Brake, 09/2009
    Calculation of ballast operations, hydrostatics
    Instruction of ballast operation
    Calculation of sea fastening and towage approval
  • Development of a stowage and securing arrangement for laying large diameter pipes on a heavy load barge for the sea transport from Rostock to Astrachan, 09/2012
  • Development and calculation of stowage and securing elements for large diameter pipes, á approx. 800 t, on a heavy load barge for a voyage from Rostock to Norway, 11/2009
  • Inclining test and workout of hydrostatics and stability booklet according to IMO and German regulations for a small passenger vessel of elder construction, 05/2011
  • Inclining test and work out of hydrostatics and stability booklet according to IMO and German regulations for a small fishing cutter, 03/2011
  • Stability calculations for a water construction barge with various heavy working tools according to German regulations VBG 40a, 08/2011

Offshore

  • Marine Warranty Surveyors for offshore windpower project “Baltic 1”, 2011 – 2012
    Survey and approval of all processes of HV export cable loading, transport, handling, storage, laying, burial, jointing and mounting
  • Marine Warranty Surveyors for the offshore windpower project “Baltic 2”, 2013 – 2015
    Survey and approval of all processes of HV export cable loading, transport, handling, storage, laying, burial, jointing and mounting

Towage Approval

  • Towage approval of a sea transport of 2 container cranes, approx. á 1100 t on heavy
    load barge from Rostock to Bronka, 07/2015
  • Towage approval of numerous self floating ship new building kaskos with displacements approx. 5000 to 8000 t from Rostock to Papenburg, 2005 – 2017
  • Towage approval of numerous sea transports of various types of harbour cranes, up to approx. 500 t each, on various barges from Rostock to various port in North and Baltic Sea incl. calculation of ballast operations for the rolling loading and unloading processes, 2008 – 2014
  • Towage approval of various ship new building sections, up to approx. 200 t each, on various barges from Rostock to various German North Sea yards incl. calculation of forces and seafastening, 2002 – 2006
  • Towage Approval of various self floating or barge based ship new building sections of various sizes from Rostock to Baltic Sea yards in 2003 – 2009

Marine Survey

  • Investigations and calculations to ascertain the start point and duration of a vessel´s sinking after grounding in 01/2004
  • Survey and investigation to ascertain the reasons for the sinking of a vessel in a Shipyard in 11/2005
  • Pre-purchase survey of a bulker, 08/2012
  • Survey and investigation of a hull damage to 2 vessels after collision to ascertain the reasons of collision and to assess extent and costs of repairs, 02/2013
  • Survey and investigation to ascertain the cause and extent of fire damage to several wind power stations on board a vessel during loading and securing in 09/2014
  • Survey of a exhaust gas system of a ship´s diesel engine to ascertain the causes for soiling the system, 10/2014
  • Cargo stowage and securing survey and calculating the seafastening for various offshore cranes, up to 700 t, Rostock – Asia in 10/2014
  • Condition survey of a coaster for valuation purposes, 04/2015
  • Survey of a ship´s diesel engine to ascertain the cause for a piston seizure and the extent of repairs in 05/2016
  • Survey to ascertain the extent, causes and costs of a wet damage to a cargo of Urea fertilizer during a sea voyage from Asia to Europe in 01/2016
  • Survey and investigation on a bunker barge and environment after an oil pollution to ascertain reasons and extent of pollution and incident management in 02/2016
  • Survey and investigation to ascertain the cause of a crash of a wind power station tower during loading into a vessel in 02/2016
  • Survey of a quay damage after ship collision and working out the repair lists for repair tender in 06/2016
  • Sounding of steel thickness and survey of condition of a restaurant barge to ascertain the status and issue of a Certificate of Floating Ability in 06/2016
  • Cargo stowage and securing survey of various, partly dismantled harbor cranes on a vessel, Rostock – Asia in 01/2017
  • Survey and investigation to ascertain the cause for shifting of a cargo of steel rails on a cargo ship during a sea voyage in 01/2017